Menu

E-Glide ST ebike assembly instructions

The assembly of your S/T is easier than assembling a regular bicycle, simply because it has already been assembled, tuned and dialed in, road tested, and repackaged. The steps it will take to get your S/T on the road are quick, simple, and easy. Anyone who follows these instructions can do it. All adjustments to derailleur, brakes , etc. have been made. You will need a 4mm and 5mm allen wrench, 15mm open end wrench and a bicycle pump with a Schrader valve attachment.

1. Set Ebike box upright, remove strapping, cut open along top edge, exposing the bike, being careful of the sharp staples.

1. Set Ebike box upright, remove strapping, cut open along top edge, exposing the bike, being careful of the sharp staples.

2. Remove the black bag, it contains your pedals, battery charger, and front wheel quick release lever.

2. Remove the black bag, it contains your pedals, battery charger, and front wheel quick release lever.

3. Remove bike from box

3. Remove bike from box

4. Cut the zip ties and remove plastic wrapping

4. Cut the zip ties and remove plastic wrapping

5. Remove fork spacer and front disc brake pad shipping spacer.

5. Remove fork spacer and front disc brake pad shipping spacer.

5a.

5a.

5b.

5b.

5c.

5c.

6. Remove battery lock keys and place in a safe place. You will need these keys if you want to remove the battery from the frame.

6. Remove battery lock keys and place in a safe place. You will need these keys if you want to remove the battery from the frame.

7. Place bike upright, resting on front fork, and insert seat post. Adjust and tighten seat quick release.

7. Place bike upright, resting on front fork, and insert seat post. Adjust and tighten seat quick release.

8. Loosen 5mm allen head top stem bolt, and reverse the stem 180 degrees, and tighten. Be sure the stem is straight, tighten first the upper side stem bolt, followed by the lower side stem bolt.

8. Loosen 5mm allen head top stem bolt, and reverse the stem 180 degrees, and tighten. Be sure the stem is straight, tighten first the upper side stem bolt, followed by the lower side stem bolt.

8a.

8a.

8b.

8b.

8c.

8c.

9. Remove four handlebar mount allenheads with No. 4 allen wrench

9. Remove four handlebar mount allenheads with No. 4 allen wrench

10. Install the handlebars, tighten only snugly, you will make final adjustments after.

10. Install the handlebars, tighten only snugly, you will make final adjustments after.

11. Take the front wheel quick release lever from the black bag. Remove locknut and spring. Slide quick release through axle, replace spring and locknut on shaft. Turn locknut only a few turns so it’s loose for easy wheel installation.

11. Take the front wheel quick release lever from the black bag. Remove locknut and spring. Slide quick release through axle, replace spring and locknut on shaft. Turn locknut only a few turns so it’s loose for easy wheel installation.

11a.

11a.

11b.

11b.

12. Gently insert wheel into fork . Carefully slide the disc brake rotor into the disc brake pads. Make sure wheel is on fork as far as it will go. Tighten the locknut, until the quick release fully tightens the axle onto the fork. You want the quick release to close snugly, but you don’t want to overtighten it. You don’t want to have to “muscle” the quick release to close it, should close firmly, but without excessive force.

12. Gently insert wheel into fork . Carefully slide the disc brake rotor into the disc brake pads. Make sure wheel is on fork as far as it will go. Tighten the locknut, until the quick release fully tightens the axle onto the fork. You want the quick release to close snugly, but you don’t want to overtighten it. You don’t want to have to “muscle” the quick release to close it, should close firmly, but without excessive force.

12a.

12a.

13. Spin the wheel. Your brake has been adjusted prior to shipment, and should be aligned perfectly.

14. Adjust handlebars to a comfortable position, and tighten allen heads snugly with a No. 4 allenhead wrench. Tighten in a X pattern.

14. Adjust handlebars to a comfortable position, and tighten allen heads snugly with a No. 4 allenhead wrench. Tighten in a X pattern.

14a.

14a.

14b.

14b.

15. The pedals are marked L for left side and R for right side Install the left pedal, and tighten COUNTER CLOCKWISE. Install the right pedal, tighten CLOCKWISE.

15. The pedals are marked L for left side and R for right side Install the left pedal, and tighten COUNTER CLOCKWISE. Install the right pedal, tighten CLOCKWISE.

15a.

15a.

16. Plug the charger into the battery, then into the wall outlet. You can charge your battery on or off the bike. The charger will turn green when fully charged.

16. Plug the charger into the battery, then into the wall outlet. You can charge your battery on or off the bike. The charger will turn green when fully charged.

READ YOUR OPERATION MANUAL INCLUDED WITH YOUR S/T BEFORE GOING FURTHER

READ YOUR OPERATION MANUAL INCLUDED WITH YOUR S/T BEFORE GOING FURTHER

Information

E-Glide was established in 2004 and is the oldest electric skateboard manufacturer in the US. With 13 years of direct sales and customer support under our belt in the electric bike and powerboard industry, it is well known that we offer world class service. We can be reached by phone anytime M-F 9-5 PST for questions, sales, or customer support.

 

Address

E-Glide
2801 Ocean Park Blvd. #303
Santa Monica, CA 90405
CALL NOW! 1-310-396-1453